Research on Architectural Design Management Optimization Based on GA and DSM
DOI:
https://doi.org/10.56028/aetr.14.1.679.2025Keywords:
Optimization research; management system; genetic algorithm; prefabricated building; collaborative mechanism.Abstract
In order to effectively solve the problems of high construction cost of prefabricated buildings, insufficient resources, and insufficient collaborative management and control capabilities. This paper conducts research on the factors affecting the construction cost of prefabricated buildings and the optimization of process management, analyzes the factors affecting the construction cost of prefabricated buildings, the hierarchical structure and the action path, constructs a lean construction process management framework system for prefabricated buildings, establishes an optimization model for the construction process management of prefabricated buildings, and proposes an integrated process management collaborative mechanism for prefabricated building projects. The research results are helpful to identify the factors affecting the construction cost of prefabricated buildings, clarify the ideas and methods for optimizing the construction process management, and maximize the benefits of the construction process. It provides a theoretical basis and important support for improving the optimization of the construction process management, collaborative management and lean construction of prefabricated buildings, and has important practical guiding significance for accelerating the industrialization of construction in my country.